Abstract
In allusion to slow error convergence of Monte Carlo method used in power system reliability evaluation, the quasi-Monte Carlo method sampled by low discrepancy sequence is applied in reliability evaluation. The principle of quasi-Monte Carlo method is presented and compared with Monte Carlo method in error analysis. Further, the construction of Sobollow discrepancy sequence is described. A quasi-Monte Carlo reliability calculation model, in which the Sobolsequence are taken as the sampling points, is established and combined with importance sampling method. For the three-machine system and RTS-79 the standard non-sequential Monte Carlo simulation and Sobolsequence quasi-Monte Carlo simulation are performed respectively to calculate reliability indices EDNS and LOLP, and the error convergence curves are compared. Comparison results show that when quasi-Monte Carlo method is applied in reliability calculation, the error convergence of indices EDNS and LOLP is faster. The proposed method can be regarded as a new thinking for power system reliability calculation.
| Original language | English |
|---|---|
| Pages (from-to) | 744-750 |
| Number of pages | 7 |
| Journal | Dianwang Jishu/Power System Technology |
| Volume | 39 |
| Issue number | 3 |
| DOIs | |
| Publication status | Published - 5 Mar 2015 |
Keywords
- Low discrepancy sequence
- Monte Carlo
- Quasi Monte Carlo
- Reliability evaluation
Fingerprint
Dive into the research topics of 'A quasi-monte carlo method based power system reliability evaluation'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver