Achieving cost competitiveness with an agent based integrated process planning and production scheduling system

Ming Lim, David Zhang

Research output: Chapter in Book/Report/Conference proceedingChapter (peer-reviewed)

Abstract

From a manufacturing perspective, the efficiency of manufacturing operations (such as process planning and production scheduling) are the key element for enhancing manufacturing competence. Process planning and production scheduling functions have been traditionally treated as two separate activities, and have resulted in a range of inefficiencies. These include infeasible process plans, non-available/overloaded resources, high production costs, long production lead times, and so on. Above all, it is unlikely that the dynamic changes can be efficiently dealt with. Despite much research has been conducted to integrate process planning and production scheduling to generate optimised solutions to improve manufacturing efficiency, there is still a gap to achieve the competence required for the current global competitive market. In this research, the concept of multi-agent system (MAS) is adopted as a means to address the aforementioned gap. A MAS consists of a collection of intelligent autonomous agents able to solve complex problems. These agents possess their individual objectives and interact with each other to fulfil the global goal. This paper describes a novel use of an autonomous agent system to facilitate the integration of process planning and production scheduling functions to cope with unpredictable demands, in terms of uncertainties in product mix and demand pattern. The novelty lies with the currency-based iterative agent bidding mechanism to allow process planning and production scheduling options to be evaluated simultaneously, so as to search for an optimised, cost-effective solution. This agent based system aims to achieve manufacturing competence by means of enhancing the flexibility and agility of manufacturing enterprises.
Original languageEnglish
Title of host publicationProduction scheduling
EditorsRodrigo da Rosa Righi
PublisherInTech
Pages185-206
Number of pages22
ISBN (Electronic)978-953-307-935-6
Publication statusPublished - Jan 2012

Fingerprint

Process planning
Scheduling
Costs
Autonomous agents
Multi agent systems
Industry

Bibliographical note

Creative Commons - Attribution 3.0

Cite this

Lim, M., & Zhang, D. (2012). Achieving cost competitiveness with an agent based integrated process planning and production scheduling system. In R. da Rosa Righi (Ed.), Production scheduling (pp. 185-206). InTech.
Lim, Ming ; Zhang, David. / Achieving cost competitiveness with an agent based integrated process planning and production scheduling system. Production scheduling. editor / Rodrigo da Rosa Righi. InTech, 2012. pp. 185-206
@inbook{49db4a0381504dc4ac379209e9c3c974,
title = "Achieving cost competitiveness with an agent based integrated process planning and production scheduling system",
abstract = "From a manufacturing perspective, the efficiency of manufacturing operations (such as process planning and production scheduling) are the key element for enhancing manufacturing competence. Process planning and production scheduling functions have been traditionally treated as two separate activities, and have resulted in a range of inefficiencies. These include infeasible process plans, non-available/overloaded resources, high production costs, long production lead times, and so on. Above all, it is unlikely that the dynamic changes can be efficiently dealt with. Despite much research has been conducted to integrate process planning and production scheduling to generate optimised solutions to improve manufacturing efficiency, there is still a gap to achieve the competence required for the current global competitive market. In this research, the concept of multi-agent system (MAS) is adopted as a means to address the aforementioned gap. A MAS consists of a collection of intelligent autonomous agents able to solve complex problems. These agents possess their individual objectives and interact with each other to fulfil the global goal. This paper describes a novel use of an autonomous agent system to facilitate the integration of process planning and production scheduling functions to cope with unpredictable demands, in terms of uncertainties in product mix and demand pattern. The novelty lies with the currency-based iterative agent bidding mechanism to allow process planning and production scheduling options to be evaluated simultaneously, so as to search for an optimised, cost-effective solution. This agent based system aims to achieve manufacturing competence by means of enhancing the flexibility and agility of manufacturing enterprises.",
author = "Ming Lim and David Zhang",
note = "Creative Commons - Attribution 3.0",
year = "2012",
month = "1",
language = "English",
pages = "185--206",
editor = "{da Rosa Righi}, Rodrigo",
booktitle = "Production scheduling",
publisher = "InTech",
address = "Croatia",

}

Lim, M & Zhang, D 2012, Achieving cost competitiveness with an agent based integrated process planning and production scheduling system. in R da Rosa Righi (ed.), Production scheduling. InTech, pp. 185-206.

Achieving cost competitiveness with an agent based integrated process planning and production scheduling system. / Lim, Ming; Zhang, David.

Production scheduling. ed. / Rodrigo da Rosa Righi. InTech, 2012. p. 185-206.

Research output: Chapter in Book/Report/Conference proceedingChapter (peer-reviewed)

TY - CHAP

T1 - Achieving cost competitiveness with an agent based integrated process planning and production scheduling system

AU - Lim, Ming

AU - Zhang, David

N1 - Creative Commons - Attribution 3.0

PY - 2012/1

Y1 - 2012/1

N2 - From a manufacturing perspective, the efficiency of manufacturing operations (such as process planning and production scheduling) are the key element for enhancing manufacturing competence. Process planning and production scheduling functions have been traditionally treated as two separate activities, and have resulted in a range of inefficiencies. These include infeasible process plans, non-available/overloaded resources, high production costs, long production lead times, and so on. Above all, it is unlikely that the dynamic changes can be efficiently dealt with. Despite much research has been conducted to integrate process planning and production scheduling to generate optimised solutions to improve manufacturing efficiency, there is still a gap to achieve the competence required for the current global competitive market. In this research, the concept of multi-agent system (MAS) is adopted as a means to address the aforementioned gap. A MAS consists of a collection of intelligent autonomous agents able to solve complex problems. These agents possess their individual objectives and interact with each other to fulfil the global goal. This paper describes a novel use of an autonomous agent system to facilitate the integration of process planning and production scheduling functions to cope with unpredictable demands, in terms of uncertainties in product mix and demand pattern. The novelty lies with the currency-based iterative agent bidding mechanism to allow process planning and production scheduling options to be evaluated simultaneously, so as to search for an optimised, cost-effective solution. This agent based system aims to achieve manufacturing competence by means of enhancing the flexibility and agility of manufacturing enterprises.

AB - From a manufacturing perspective, the efficiency of manufacturing operations (such as process planning and production scheduling) are the key element for enhancing manufacturing competence. Process planning and production scheduling functions have been traditionally treated as two separate activities, and have resulted in a range of inefficiencies. These include infeasible process plans, non-available/overloaded resources, high production costs, long production lead times, and so on. Above all, it is unlikely that the dynamic changes can be efficiently dealt with. Despite much research has been conducted to integrate process planning and production scheduling to generate optimised solutions to improve manufacturing efficiency, there is still a gap to achieve the competence required for the current global competitive market. In this research, the concept of multi-agent system (MAS) is adopted as a means to address the aforementioned gap. A MAS consists of a collection of intelligent autonomous agents able to solve complex problems. These agents possess their individual objectives and interact with each other to fulfil the global goal. This paper describes a novel use of an autonomous agent system to facilitate the integration of process planning and production scheduling functions to cope with unpredictable demands, in terms of uncertainties in product mix and demand pattern. The novelty lies with the currency-based iterative agent bidding mechanism to allow process planning and production scheduling options to be evaluated simultaneously, so as to search for an optimised, cost-effective solution. This agent based system aims to achieve manufacturing competence by means of enhancing the flexibility and agility of manufacturing enterprises.

M3 - Chapter (peer-reviewed)

SP - 185

EP - 206

BT - Production scheduling

A2 - da Rosa Righi, Rodrigo

PB - InTech

ER -

Lim M, Zhang D. Achieving cost competitiveness with an agent based integrated process planning and production scheduling system. In da Rosa Righi R, editor, Production scheduling. InTech. 2012. p. 185-206