Abstract
The main purpose of this paper is to determine the best performance time period of a
system, consisting some DMUs, among some sequential time periods. This aim is satised
by two proposed algorithms, the rst based on global Malmquist Productivity Index and
the second is based on PPS frontiers.
system, consisting some DMUs, among some sequential time periods. This aim is satised
by two proposed algorithms, the rst based on global Malmquist Productivity Index and
the second is based on PPS frontiers.
| Original language | English |
|---|---|
| Pages (from-to) | 13-18 |
| Journal | International Journal of Industrial Mathematics |
| Volume | 1 |
| Issue number | 1 |
| Publication status | Published - 2009 |
Bibliographical note
International Journal of Industrial Mathematics (IJIM) will be published using an open access publication model, meaning that all interested readers will be able to freely access the journal online without the need for a subscription.Fingerprint
Dive into the research topics of 'Determining the Best Performance Time Period of a System'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver