Exergoeconomic and Environmental Modeling of Integrated Polygeneration Power Plant with Biomass-Based Syngas Supplemental Firing

  • Fidelis. I. Abam
  • , Ogheneruona E. Diemuodeke*
  • , Ekwe. B. Ekwe
  • , Mohammed Alghassab
  • , Olusegun D. Samuel
  • , Zafar A. Khan
  • , Muhammad Imran
  • , Muhammad Farooq
  • *Corresponding author for this work
  • Energy, Exergy, and Environment Research Group (EEERG), Department of Mechanical Engineering, Michael Okpara University of Agriculture Umudike, Umudike 440109, Nigeria
  • Energy and Thermofluids Research Group, Department of Mechanical Engineering, Faculty of Engineering, University of Port Harcourt, PMB 5323, Choba, Port Harcourt 500102, Nigeria
  • Department of Electrical and Computer Engineering, Shaqra University, Riyadh B11911, Saudi Arabia
  • Department of Mechanical Engineering, Federal University of Petroleum Resources Effurun, P.M.B 1221, Effurun, Effurun 330102, Nigeria
  • Department of Mechanical Engineering, University of Engineering and Technology Lahore, New Campus-KSK 54800, Pakistan

Research output: Contribution to journal › Article › peer-review

31   Link opens in a new tab Citations (SciVal)
19 Downloads (Pure)

Abstract

There is a burden of adequate energy supply for meeting demand and reducing emission to avoid the average global temperature of above 2 °C of the pre-industrial era. Therefore, this study presents the exergoeconomic and environmental analysis of a proposed integrated multi-generation plant (IMP), with supplemental biomass-based syngas firing. An in-service gas turbine plant, fired by natural gas, was retrofitted with a gas turbine (GT), steam turbine (ST), organic Rankine cycle (ORC) for cooling and power production, a modified Kalina cycle (KC) for power production and cooling, and a vapour absorption system (VAB) for cooling. The overall network, energy efficiency, and exergy efficiency of the IMP were estimated at 183 MW, 61.50% and 44.22%, respectively. The specific emissions were estimated at 122.2, 0.222, and 3.0 × 10−7 kg/MWh for CO2, NOx, and CO, respectively. Similarly, the harmful fuel emission factor, and newly introduced sustainability indicators—exergo-thermal index (ETI) and exergetic utility exponent (EUE)—were obtained as 0.00067, 0.675, and 0.734, respectively. The LCC of $1.58 million was obtained, with a payback of 4 years, while the unit cost of energy was estimated at 0.0166 $/kWh. The exergoeconomic factor and the relative cost difference of the IMP were obtained as 50.37% and 162.38%, respectively. The optimum operating parameters obtained by a genetic algorithm gave the plant’s total cost rate of 125.83 $/hr and exergy efficiency of 39.50%. The proposed system had the potential to drive the current energy transition crisis caused by the COVID-19 pandemic shock in the energy sector.
Original languageEnglish
Article number6018
JournalEnergies
Volume13
Issue number22
DOIs
Publication statusPublished - 18 Nov 2020

Bibliographical note

© 2020 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/).

Funding Information:
This research received no external funding.

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 7 - Affordable and Clean Energy
    SDG 7 Affordable and Clean Energy

Keywords

  • gas turbine
  • multigeneration
  • exergetic utility exponent
  • thermo-enviroeconomic
  • exergy

Fingerprint