Keyphrases
Computational Results
33%
Controllable Processing Times
33%
Earliness
33%
Energy Consumption
33%
Failure-prone
100%
Flexible Manufacturing System
33%
Hedging Point Policy
33%
Heuristic Algorithms
33%
Job Processing
33%
Job Shop
33%
Job Shop Scheduling Problem
100%
Maintenance Interval
33%
Managerial Insights
33%
Mixed Integer Programming Model
33%
Multi-objective Optimization
100%
Near-optimal Solution
33%
Non-dominated Sorting Genetic Algorithm (NSGA-II)
100%
NSGA-II Algorithm
33%
Optimal Production Rate
33%
Pareto Optimal Solution
33%
Preventive Maintenance
33%
Processing Time
33%
Production Cost
33%
Production Reliability
33%
Production Scheduling
33%
Simulation Method
100%
Simulations II
33%
Simultaneous Optimization
33%
Stochastic Failure
100%
System Efficiency
33%
System Energy
33%
System Reliability
33%
Tardiness
33%
Computer Science
Algorithm Converges
50%
Early Research
50%
Energy Consumption
50%
Job Shop Scheduling Problems
100%
Maintenance Period
50%
Metaheuristic Algorithm
50%
Mixed Integer Programming
50%
Multi-Objective Optimization
100%
Multiobjective
50%
Non-Dominated Sorting Genetic Algorithm II
100%
Pareto Optimal Solution
50%
Preventive Maintenance
50%
Processing Time
100%
Production Scheduling
50%
Programming Model
50%
System Efficiency
50%
Engineering
Flexible Manufacturing System
50%
Mixed-Integer Programming Model
50%
Multiobjective Optimization
100%
Non-Dominated Sorting Genetic Algorithm II
100%
Pareto Optimal Solution
50%
Preventive Maintenance
50%
Processing Time
100%
Simulation Method
100%
System Efficiency
50%
System Reliability
50%
Mathematics
Integer Programming
33%
Multiobjective Optimization
100%
Pareto Optimal
33%
Preventive Maintenance
33%
Stochastics
100%
Economics, Econometrics and Finance
Flexible Manufacturing System
25%
Hedging
25%
Machinery
25%
Metaheuristics
25%
Mixed-Integer Programming
25%
Production Costs
25%
Scheduling Problem
100%