This paper addresses the question of how just-in-time can be implemented within high variety manufacture. To illustrate some of the principles in relation to the high variety-low volume situation the case of a computer manufacturer is considered in detail. For contrast the paper also considers the case of the manufacture of highly-configured four wheel drive vehicles where both variety and volumes are high. The most important issue in high variety/low volume production is that JIT operation should be seen in terms of the tactical holding of inventory in upstream buffers within the supply chain so that value is not added to work in progress prematurely. Tactical buffers ensure that service levels are maintained and the risk of stock-outs is minimized. In high variety/high volume production schedule integrity is the key factor, unreliable schedules being a major inhibitor to the introduction of JIT.
Original languageEnglish
Pages (from-to)73-80
Number of pages8
JournalInternational Journal of Logistics Management
Volume5
Issue number1
DOIs
Publication statusPublished - 1994

Fingerprint

Supply chains
integrity
Wheels
supply
Values
time
Product variety
Just-in-time
Buffer
Schedule
Stockouts
Factors
Inhibitor
Service levels
Integrity
Supply chain

Keywords

  • inventory
  • just in time
  • product range
  • production management
  • stock control

Cite this

@article{bf507e41393e4f8caed16db2d723f6c4,
title = "Product variety and just-in-time conflict and challenge",
abstract = "This paper addresses the question of how just-in-time can be implemented within high variety manufacture. To illustrate some of the principles in relation to the high variety-low volume situation the case of a computer manufacturer is considered in detail. For contrast the paper also considers the case of the manufacture of highly-configured four wheel drive vehicles where both variety and volumes are high. The most important issue in high variety/low volume production is that JIT operation should be seen in terms of the tactical holding of inventory in upstream buffers within the supply chain so that value is not added to work in progress prematurely. Tactical buffers ensure that service levels are maintained and the risk of stock-outs is minimized. In high variety/high volume production schedule integrity is the key factor, unreliable schedules being a major inhibitor to the introduction of JIT.",
keywords = "inventory, just in time, product range, production management, stock control",
author = "Bennett, {David J.} and Paul Forrester",
year = "1994",
doi = "10.1108/09574099410805090",
language = "English",
volume = "5",
pages = "73--80",
journal = "International Journal of Logistics Management",
issn = "0957-4093",
publisher = "Emerald Group Publishing Ltd.",
number = "1",

}

Product variety and just-in-time conflict and challenge. / Bennett, David J.; Forrester, Paul.

In: International Journal of Logistics Management, Vol. 5, No. 1, 1994, p. 73-80.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Product variety and just-in-time conflict and challenge

AU - Bennett, David J.

AU - Forrester, Paul

PY - 1994

Y1 - 1994

N2 - This paper addresses the question of how just-in-time can be implemented within high variety manufacture. To illustrate some of the principles in relation to the high variety-low volume situation the case of a computer manufacturer is considered in detail. For contrast the paper also considers the case of the manufacture of highly-configured four wheel drive vehicles where both variety and volumes are high. The most important issue in high variety/low volume production is that JIT operation should be seen in terms of the tactical holding of inventory in upstream buffers within the supply chain so that value is not added to work in progress prematurely. Tactical buffers ensure that service levels are maintained and the risk of stock-outs is minimized. In high variety/high volume production schedule integrity is the key factor, unreliable schedules being a major inhibitor to the introduction of JIT.

AB - This paper addresses the question of how just-in-time can be implemented within high variety manufacture. To illustrate some of the principles in relation to the high variety-low volume situation the case of a computer manufacturer is considered in detail. For contrast the paper also considers the case of the manufacture of highly-configured four wheel drive vehicles where both variety and volumes are high. The most important issue in high variety/low volume production is that JIT operation should be seen in terms of the tactical holding of inventory in upstream buffers within the supply chain so that value is not added to work in progress prematurely. Tactical buffers ensure that service levels are maintained and the risk of stock-outs is minimized. In high variety/high volume production schedule integrity is the key factor, unreliable schedules being a major inhibitor to the introduction of JIT.

KW - inventory

KW - just in time

KW - product range

KW - production management

KW - stock control

UR - http://www.emeraldinsight.com/journals.htm?articleid=1527387&show=abstract

U2 - 10.1108/09574099410805090

DO - 10.1108/09574099410805090

M3 - Article

VL - 5

SP - 73

EP - 80

JO - International Journal of Logistics Management

JF - International Journal of Logistics Management

SN - 0957-4093

IS - 1

ER -