Study on key performance indicators to investigate long-term performance of post-disaster housing

Jude Prasanna, Eshi Wijegunarathne, Gayan Wedawatta

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Abstract

Post disaster reconstruction is a vital phase in disaster management cycle. It aims to restore and improve pre-disaster living condition of affected communities. It is an opportunity to lay foundation for long-term risk reduction, also to contribute safer and sustainable development. Research has shown that permanent re-construction following a natural disaster is often inefficiently managed, uncoordinated, and importantly overlooks the long term requirements of the affected community. Adopting a long-term approach to re-construction however is required to ensure sustainable housing provisions and sustainability of local communities. Following the Tsunami devastation in 2004 in Sri Lanka, thousands of houses were damaged and destroyed and were rebuilt. Two approaches; “Donor Driven” approach and “Owner Driven” approaches have been employed to rebuild post disaster housing reconstruction. Studies revealed smooth flow of this construction process was disturbed by certain gaps that occurred throughout the above post disaster reconstruction programme. How these housing schemes perform in the long-term is seldom investigated. As the post tsunami housing schemes have now been in place for a reasonable period of time, it is timely to investigate how the schemes have performed up to now. A key step towards assessing long-term performance is to identify criteria to be used for assessment. In light of the above, this paper documents and suggest Key Performance Indicators (KPI) to be assessed in order to investigate the long-term performance of post-disaster housing reconstruction projects in Sri Lanka. An extensive literature review and expert interviews aided this task. Findings of this research will inform the policy-makers and practitioners to outline the KPIs
to investigate how the post-disaster housing re-construction projects have performed in the long-term.
Original languageEnglish
Title of host publicationProceedings of National Building Research Organisation (NBRO) International Symposium 2016
Subtitle of host publicationRisk Awareness and Future Challenges
Place of PublicationColombo
Number of pages9
Publication statusPublished - 6 Dec 2016
EventNBRO International Symposium 2016: Risk awareness and Future challenges - Waters Edge, Colombo, Sri Lanka
Duration: 6 Dec 20167 Dec 2016

Conference

ConferenceNBRO International Symposium 2016
CountrySri Lanka
CityColombo
Period6/12/167/12/16

Fingerprint

Disasters
Tsunamis
Sustainable development

Bibliographical note

Copyright © 2018 National Building Research Organisation. All Rights Reserved.

Keywords

  • Post-disaster
  • housing reconstruction
  • long-term performance

Cite this

Prasanna, J., Wijegunarathne, E., & Wedawatta, G. (2016). Study on key performance indicators to investigate long-term performance of post-disaster housing. In Proceedings of National Building Research Organisation (NBRO) International Symposium 2016: Risk Awareness and Future Challenges Colombo.
Prasanna, Jude ; Wijegunarathne, Eshi ; Wedawatta, Gayan. / Study on key performance indicators to investigate long-term performance of post-disaster housing. Proceedings of National Building Research Organisation (NBRO) International Symposium 2016: Risk Awareness and Future Challenges. Colombo, 2016.
@inproceedings{ac27ee5f176342229c2d71dce1cae82c,
title = "Study on key performance indicators to investigate long-term performance of post-disaster housing",
abstract = "Post disaster reconstruction is a vital phase in disaster management cycle. It aims to restore and improve pre-disaster living condition of affected communities. It is an opportunity to lay foundation for long-term risk reduction, also to contribute safer and sustainable development. Research has shown that permanent re-construction following a natural disaster is often inefficiently managed, uncoordinated, and importantly overlooks the long term requirements of the affected community. Adopting a long-term approach to re-construction however is required to ensure sustainable housing provisions and sustainability of local communities. Following the Tsunami devastation in 2004 in Sri Lanka, thousands of houses were damaged and destroyed and were rebuilt. Two approaches; “Donor Driven” approach and “Owner Driven” approaches have been employed to rebuild post disaster housing reconstruction. Studies revealed smooth flow of this construction process was disturbed by certain gaps that occurred throughout the above post disaster reconstruction programme. How these housing schemes perform in the long-term is seldom investigated. As the post tsunami housing schemes have now been in place for a reasonable period of time, it is timely to investigate how the schemes have performed up to now. A key step towards assessing long-term performance is to identify criteria to be used for assessment. In light of the above, this paper documents and suggest Key Performance Indicators (KPI) to be assessed in order to investigate the long-term performance of post-disaster housing reconstruction projects in Sri Lanka. An extensive literature review and expert interviews aided this task. Findings of this research will inform the policy-makers and practitioners to outline the KPIsto investigate how the post-disaster housing re-construction projects have performed in the long-term.",
keywords = "Post-disaster, housing reconstruction, long-term performance",
author = "Jude Prasanna and Eshi Wijegunarathne and Gayan Wedawatta",
note = "Copyright {\circledC} 2018 National Building Research Organisation. All Rights Reserved.",
year = "2016",
month = "12",
day = "6",
language = "English",
isbn = "978-955-0283-08-8",
booktitle = "Proceedings of National Building Research Organisation (NBRO) International Symposium 2016",

}

Prasanna, J, Wijegunarathne, E & Wedawatta, G 2016, Study on key performance indicators to investigate long-term performance of post-disaster housing. in Proceedings of National Building Research Organisation (NBRO) International Symposium 2016: Risk Awareness and Future Challenges. Colombo, NBRO International Symposium 2016, Colombo, Sri Lanka, 6/12/16.

Study on key performance indicators to investigate long-term performance of post-disaster housing. / Prasanna, Jude; Wijegunarathne, Eshi; Wedawatta, Gayan.

Proceedings of National Building Research Organisation (NBRO) International Symposium 2016: Risk Awareness and Future Challenges. Colombo, 2016.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

TY - GEN

T1 - Study on key performance indicators to investigate long-term performance of post-disaster housing

AU - Prasanna, Jude

AU - Wijegunarathne, Eshi

AU - Wedawatta, Gayan

N1 - Copyright © 2018 National Building Research Organisation. All Rights Reserved.

PY - 2016/12/6

Y1 - 2016/12/6

N2 - Post disaster reconstruction is a vital phase in disaster management cycle. It aims to restore and improve pre-disaster living condition of affected communities. It is an opportunity to lay foundation for long-term risk reduction, also to contribute safer and sustainable development. Research has shown that permanent re-construction following a natural disaster is often inefficiently managed, uncoordinated, and importantly overlooks the long term requirements of the affected community. Adopting a long-term approach to re-construction however is required to ensure sustainable housing provisions and sustainability of local communities. Following the Tsunami devastation in 2004 in Sri Lanka, thousands of houses were damaged and destroyed and were rebuilt. Two approaches; “Donor Driven” approach and “Owner Driven” approaches have been employed to rebuild post disaster housing reconstruction. Studies revealed smooth flow of this construction process was disturbed by certain gaps that occurred throughout the above post disaster reconstruction programme. How these housing schemes perform in the long-term is seldom investigated. As the post tsunami housing schemes have now been in place for a reasonable period of time, it is timely to investigate how the schemes have performed up to now. A key step towards assessing long-term performance is to identify criteria to be used for assessment. In light of the above, this paper documents and suggest Key Performance Indicators (KPI) to be assessed in order to investigate the long-term performance of post-disaster housing reconstruction projects in Sri Lanka. An extensive literature review and expert interviews aided this task. Findings of this research will inform the policy-makers and practitioners to outline the KPIsto investigate how the post-disaster housing re-construction projects have performed in the long-term.

AB - Post disaster reconstruction is a vital phase in disaster management cycle. It aims to restore and improve pre-disaster living condition of affected communities. It is an opportunity to lay foundation for long-term risk reduction, also to contribute safer and sustainable development. Research has shown that permanent re-construction following a natural disaster is often inefficiently managed, uncoordinated, and importantly overlooks the long term requirements of the affected community. Adopting a long-term approach to re-construction however is required to ensure sustainable housing provisions and sustainability of local communities. Following the Tsunami devastation in 2004 in Sri Lanka, thousands of houses were damaged and destroyed and were rebuilt. Two approaches; “Donor Driven” approach and “Owner Driven” approaches have been employed to rebuild post disaster housing reconstruction. Studies revealed smooth flow of this construction process was disturbed by certain gaps that occurred throughout the above post disaster reconstruction programme. How these housing schemes perform in the long-term is seldom investigated. As the post tsunami housing schemes have now been in place for a reasonable period of time, it is timely to investigate how the schemes have performed up to now. A key step towards assessing long-term performance is to identify criteria to be used for assessment. In light of the above, this paper documents and suggest Key Performance Indicators (KPI) to be assessed in order to investigate the long-term performance of post-disaster housing reconstruction projects in Sri Lanka. An extensive literature review and expert interviews aided this task. Findings of this research will inform the policy-makers and practitioners to outline the KPIsto investigate how the post-disaster housing re-construction projects have performed in the long-term.

KW - Post-disaster

KW - housing reconstruction

KW - long-term performance

M3 - Conference contribution

SN - 978-955-0283-08-8

BT - Proceedings of National Building Research Organisation (NBRO) International Symposium 2016

CY - Colombo

ER -

Prasanna J, Wijegunarathne E, Wedawatta G. Study on key performance indicators to investigate long-term performance of post-disaster housing. In Proceedings of National Building Research Organisation (NBRO) International Symposium 2016: Risk Awareness and Future Challenges. Colombo. 2016