Supply chain optimisation of pyrolysis plant deployment using goal programming

J.D. Nixon, P.K. Dey, P.A. Davies, S. Sagi, R.F. Berry

Research output: Contribution to journalArticle

Abstract

This paper presents a goal programming model to optimise the deployment of pyrolysis plants in Punjab, India. Punjab has an abundance of waste straw and pyrolysis can convert this waste into alternative bio-fuels, which will facilitate the provision of valuable energy services and reduce open field burning. A goal programming model is outlined and demonstrated in two case study applications: small scale operations in villages and large scale deployment across Punjab's districts. To design the supply chain, optimal decisions for location, size and number of plants, downstream energy applications and feedstocks processed are simultaneously made based on stakeholder requirements for capital cost, payback period and production cost of bio-oil and electricity. The model comprises quantitative data obtained from primary research and qualitative data gathered from farmers and potential investors. The Punjab district of Fatehgarh Sahib is found to be the ideal location to initially utilise pyrolysis technology. We conclude that goal programming is an improved method over more conventional methods used in the literature for project planning in the field of bio-energy. The model and findings developed from this study will be particularly valuable to investors, plant developers and municipalities interested in waste to energy in India and elsewhere.
Original languageEnglish
Pages (from-to)262–271
Number of pages10
JournalEnergy
Volume68
Early online date12 Mar 2014
DOIs
Publication statusPublished - 15 Apr 2014

Fingerprint

Supply chains
Pyrolysis
Straw
Feedstocks
Costs
Electricity
Planning

Keywords

  • goal programming
  • pyrolysis
  • waste-to-energy
  • energy recovery from waste
  • multi-criteria decision-making
  • multi-criteria decision-analysis

Cite this

Nixon, J.D. ; Dey, P.K. ; Davies, P.A. ; Sagi, S. ; Berry, R.F. / Supply chain optimisation of pyrolysis plant deployment using goal programming. In: Energy. 2014 ; Vol. 68. pp. 262–271.
@article{8db9ce0681854256841437b87ced4e33,
title = "Supply chain optimisation of pyrolysis plant deployment using goal programming",
abstract = "This paper presents a goal programming model to optimise the deployment of pyrolysis plants in Punjab, India. Punjab has an abundance of waste straw and pyrolysis can convert this waste into alternative bio-fuels, which will facilitate the provision of valuable energy services and reduce open field burning. A goal programming model is outlined and demonstrated in two case study applications: small scale operations in villages and large scale deployment across Punjab's districts. To design the supply chain, optimal decisions for location, size and number of plants, downstream energy applications and feedstocks processed are simultaneously made based on stakeholder requirements for capital cost, payback period and production cost of bio-oil and electricity. The model comprises quantitative data obtained from primary research and qualitative data gathered from farmers and potential investors. The Punjab district of Fatehgarh Sahib is found to be the ideal location to initially utilise pyrolysis technology. We conclude that goal programming is an improved method over more conventional methods used in the literature for project planning in the field of bio-energy. The model and findings developed from this study will be particularly valuable to investors, plant developers and municipalities interested in waste to energy in India and elsewhere.",
keywords = "goal programming, pyrolysis, waste-to-energy , energy recovery from waste, multi-criteria decision-making, multi-criteria decision-analysis",
author = "J.D. Nixon and P.K. Dey and P.A. Davies and S. Sagi and R.F. Berry",
year = "2014",
month = "4",
day = "15",
doi = "10.1016/j.energy.2014.02.058",
language = "English",
volume = "68",
pages = "262–271",
journal = "Energy",
issn = "0360-5442",
publisher = "Elsevier",

}

Supply chain optimisation of pyrolysis plant deployment using goal programming. / Nixon, J.D.; Dey, P.K.; Davies, P.A.; Sagi, S.; Berry, R.F.

In: Energy, Vol. 68, 15.04.2014, p. 262–271.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Supply chain optimisation of pyrolysis plant deployment using goal programming

AU - Nixon, J.D.

AU - Dey, P.K.

AU - Davies, P.A.

AU - Sagi, S.

AU - Berry, R.F.

PY - 2014/4/15

Y1 - 2014/4/15

N2 - This paper presents a goal programming model to optimise the deployment of pyrolysis plants in Punjab, India. Punjab has an abundance of waste straw and pyrolysis can convert this waste into alternative bio-fuels, which will facilitate the provision of valuable energy services and reduce open field burning. A goal programming model is outlined and demonstrated in two case study applications: small scale operations in villages and large scale deployment across Punjab's districts. To design the supply chain, optimal decisions for location, size and number of plants, downstream energy applications and feedstocks processed are simultaneously made based on stakeholder requirements for capital cost, payback period and production cost of bio-oil and electricity. The model comprises quantitative data obtained from primary research and qualitative data gathered from farmers and potential investors. The Punjab district of Fatehgarh Sahib is found to be the ideal location to initially utilise pyrolysis technology. We conclude that goal programming is an improved method over more conventional methods used in the literature for project planning in the field of bio-energy. The model and findings developed from this study will be particularly valuable to investors, plant developers and municipalities interested in waste to energy in India and elsewhere.

AB - This paper presents a goal programming model to optimise the deployment of pyrolysis plants in Punjab, India. Punjab has an abundance of waste straw and pyrolysis can convert this waste into alternative bio-fuels, which will facilitate the provision of valuable energy services and reduce open field burning. A goal programming model is outlined and demonstrated in two case study applications: small scale operations in villages and large scale deployment across Punjab's districts. To design the supply chain, optimal decisions for location, size and number of plants, downstream energy applications and feedstocks processed are simultaneously made based on stakeholder requirements for capital cost, payback period and production cost of bio-oil and electricity. The model comprises quantitative data obtained from primary research and qualitative data gathered from farmers and potential investors. The Punjab district of Fatehgarh Sahib is found to be the ideal location to initially utilise pyrolysis technology. We conclude that goal programming is an improved method over more conventional methods used in the literature for project planning in the field of bio-energy. The model and findings developed from this study will be particularly valuable to investors, plant developers and municipalities interested in waste to energy in India and elsewhere.

KW - goal programming

KW - pyrolysis

KW - waste-to-energy

KW - energy recovery from waste

KW - multi-criteria decision-making

KW - multi-criteria decision-analysis

UR - http://www.scopus.com/inward/record.url?scp=84895777182&partnerID=8YFLogxK

U2 - 10.1016/j.energy.2014.02.058

DO - 10.1016/j.energy.2014.02.058

M3 - Article

AN - SCOPUS:84898040262

VL - 68

SP - 262

EP - 271

JO - Energy

JF - Energy

SN - 0360-5442

ER -